May 23, 2012- The grout is in! Last night I was able to grout the entire floor. It is coming along nicely. I am really happy with the look of it. Tonight or tomorrow I will seal the grout lines, then call it done. Next up is painting, some trim work and then tiling the shower. Vanity and linen closet are in the works and will be installed in about 3 weeks. Then another two weeks for the countertop and sink to be installed. Progress, while slow, is still progress!