Saturday, June 19, 2010

Finished Project

As most of you know if you are a follower of the blog, that I have been working on my downstairs bathroom since March. I am happy to say that it is done. I finished about a week ago and we have our first guest in the house using it this week. I am very happy with the project overall. It was a huge learning process and I am very happy with the resources and people I had along the way to help me. Check out the before and after shots of the bathroom.



The Vanity and Medicine Cabinet. Also notice the peel and stick tile floor.


The old toilet and the old shower liner.

The old shower was 32" x 32". Quite cozy to those who had showered down there. In my four years here I had never showered downstairs.

Now the NEW Bathroom!

The New Vanity, Mirror and Towel Rack


The New Shower


New Toilet and Custom Built Shelf

New Artwork throughout the bathroom.

All in all here is a run down of the total project:

1. Tore out old flooring shower, vanity, trim, toilet , a few walls and framing
2. Expanded shower and built two new walls
3. Added light into shower
4. Built custom shower pan for base of shower
5. Tiled shower floor, walls and bathroom floor
6. New toilet, vanity, trim, shower fixtures and piping
7. Custom shelf, new mirror, artwork (images I took)
8. New paint on walls and ceiling

So pretty much a complete gut job. I loved demolition, hated drywall, grouting I could do better on but am very happy with the finished project.

Looking forward to many family and friends hanging out in my new bathroom :)

No comments: