May 7, 2012- This past weekend saw some great progress. The entire room is mudded, sanded and now primed. Last night I cut the subfloor material I will be using under the floor tile. Now tonight I need to mix up some thinset, mud the floor and apply the material. Should be a fun, hopefully non-messy project. Then it is time to tile the floor so the cabinet maker can get in and measure what he needs to.
I am having a painter come in to paint the ceiling and do a knock down finish. Need to get that done soon so I can move to tiling the shower once the floor is done.
Progress... as slow as it may be is still progress.
Oil Man - post race listicle!
9 years ago
No comments:
Post a Comment